BidMyJob

How much does it cost to have a shed built?

Updated 1 Nov 2026

Typical cost per shed

£100 – £350

Having a flat-pack shed assembled in the UK typically costs £100–£350 for labour, depending on size and type. A small 6x4 timber or plastic shed sits at the lower end, while a large 10x8 timber shed or a log cabin-style building costs more. The base is usually priced separately, and it often costs as much as the assembly.

JobTypical cost
Small timber shed, 6x4 or 7x5£100 – £180
Medium timber shed, 8x6£150 – £250
Large timber shed, 10x8 or bigger£220 – £400
Metal shed (any common size)£120 – £300
Plastic or resin shed£80 – £200
Paving slab base, 8x6£250 – £500
Concrete base, 8x6£300 – £600
Timber frame or plastic grid base£100 – £300
Replacement felt roof (small to medium shed)£100 – £250
Summerhouse or greenhouse assembly£200 – £600
Old shed dismantling and removal£80 – £250

Typical UK guide prices — see the note at the foot of this page.

Furniture Assembly prices by region

Labour rates vary across the UK, so the same furniture assembly job usually costs more in London and the South East than in the South West, Wales or the North. Here is roughly how the typical range shifts by region (per shed).

RegionTypical cost
London£130 – £460
South East£110 – £390
East of England£105 – £370
South West£100 – £350
Midlands£95 – £330
Scotland£95 – £330
North of England£90 – £320
Wales£90 – £320
Northern Ireland£85 – £300

Estimates based on regional labour rates, not quotes — your price depends on the job itself.

Shed assembly cost by size

Most handy people and fitters quote a fixed price for building a flat-pack shed, based on its size and type.

A small timber shed of 6x4 or 7x5 feet usually costs £100–£180 to assemble and takes one person around half a day. A medium 8x6 shed is typically £150–£250. Large sheds of 10x8 and above, or ones with double doors, windows and partitions, run £220–£400 and often need two people.

The assembly price normally covers building the walls, floor, roof and doors, fitting the roof felt supplied, and hanging the door. It usually assumes a level, ready base is already in place. If it is not, the base is a separate job.

Ask whether the price includes treating the timber. Many flat-pack sheds are only dip-treated in the factory and need a coat of preserver soon after building, which takes extra time and materials.

Timber, metal or plastic sheds

Timber sheds are the most common. Overlap cladding is cheapest, shiplap and tongue and groove are sturdier. They are reasonably quick to build, but the panels are heavy and the roof needs felting.

Metal sheds are lighter but come with hundreds of small screws and bolts, and the instructions can be hard going. They need a very level, square base and must be anchored down, as they can move in high winds. Assembly takes longer than you might expect for the size, so prices are similar to or above a timber shed.

Plastic or resin sheds are usually the quickest to put together, with panels that slot or clip in. They still need a flat base, and some larger models need two people. They are often the cheapest to have assembled.

Log cabins and garden rooms are a different category, with thick interlocking logs, and are normally priced as a bigger project rather than shed assembly.

Shed base costs

Every shed needs a firm, level base, and a poor base is the most common reason for doors that stick and floors that rot.

Paving slabs on a compacted sub-base are a popular choice, typically £250–£500 for an 8x6 shed including materials and labour.

A concrete base is the most solid option, typically £300–£600 for an 8x6 shed. It needs time to cure before the shed goes on, so it is often a separate visit.

A treated timber frame or a plastic grid base filled with gravel costs less, around £100–£300, and works well for smaller sheds and on slightly uneven ground.

The base should be a little smaller than the shed floor so rainwater runs off rather than pooling under the walls. Most sheds do not need planning permission if they meet permitted development rules on height and position, but check if the shed will be near a boundary, in front of the house, or if you are in a conservation area or the property is listed.

What affects the price?

Size and type of shed come first. Bigger sheds and metal sheds take longer.

Whether the base is ready. If the fitter has to prepare ground, lay slabs or level a frame, that is extra.

Access. Flat-pack panels are long and heavy. If they have to be carried through the house, up steps or along a narrow side path, it takes longer.

Extras such as treating the timber, fitting shelving, guttering, a better roof covering such as shingles or rubber, or a security lock.

Removing an old shed. Dismantling and taking it away usually costs £80–£250, more if it contains asbestos cement sheets. Asbestos must be handled and disposed of properly, so do not break it up yourself.

Waste. Packaging from a flat-pack shed is bulky, and anyone taking it or an old shed away should be a registered waste carrier.

Work out your own price

Add the parts together for a rough budget.

1. Assembly for your size and type of shed from the table above. 2. A base, unless you already have a level one the right size. 3. Removal of an old shed, if there is one. 4. Treatment, roof upgrades or extras you want.

Example: a new 8x6 timber shed replacing an old one. Removing the old shed £80–£250, a timber frame base £100–£300, assembly £150–£250, and a coat of preserver £30–£60. That comes to roughly £360–£860 on top of the cost of the shed itself.

Summerhouses and greenhouses are priced in a similar way but take longer. A small aluminium greenhouse is fiddly, with lots of glazing clips, and a summerhouse is usually heavier and more detailed than a shed, so expect £200–£600 for assembly.

On BidMyJob you can post the job with the shed's make, model and size, plus a photo of where it is going, and local handy people bid.

How to keep the cost down

Get the base right first. A fitter can work much faster on a level, square base, and you avoid problems later.

Have the shed delivered close to where it will go, and unpack and check all the parts before the fitter arrives. Missing parts are a common cause of a second visit.

Treat the timber yourself after assembly if you are happy to do it.

Deal with the packaging through your own recycling or tip trips.

Book outside spring. Sheds are most in demand from March to June, and fitters can be easier to book and more flexible on price in autumn and winter, weather permitting.

Frequently asked questions

How much does it cost to have a shed assembled?+

Usually £100–£350 for labour, depending on size and type. A small 6x4 shed is around £100–£180 and an 8x6 shed about £150–£250.

How much does it cost to put up a 10x8 shed?+

Typically £220–£400 for assembly on a ready base. A base adds roughly £150–£600 depending on whether it is a timber frame, slabs or concrete.

How much does a shed base cost?+

A timber frame or plastic grid base is about £100–£300, a slab base £250–£500 and a concrete base £300–£600 for an 8x6 shed.

Do I need planning permission for a shed?+

Usually not, if it meets permitted development rules on size, height and position. Check first if it is near a boundary, in front of the house, or if you are in a conservation area or a listed building.

How much does it cost to remove an old shed?+

Usually £80–£250 to dismantle and take away. It costs more if the shed contains asbestos, which needs specialist disposal.

How long does it take to build a shed?+

A small timber shed takes one person about half a day on a ready base. Larger or metal sheds can take a full day or more.

How much to re-felt a shed roof?+

Typically £100–£250 for a small to medium shed, including felt and labour. Replacing rotten roof boards costs more.

Related price guides

Ready to get it done?

Post your furniture assembly job free on BidMyJob and local people will bid. No fees, no commission — you pick who you like.

About these prices. The figures on this page are typical UK guide prices, intended to give you a realistic idea of what furniture assembly costs before you start getting quotes. They are not quotes themselves, and they are not a recommendation of any particular price.

What you actually pay varies with where you live, access to the job, the materials you choose, how urgent it is and how much work is involved — two jobs that sound identical can price very differently once someone has seen them. Always get a written quote covering the full scope of the work before agreeing anything, and treat any quote far below these ranges with the same caution as one far above.

Prices change over time, and this guide was last reviewed on the date shown at the top of the page. If something here looks wrong, we would genuinely like to know.