How much does tiling cost?
Updated 19 Oct 2026
Typical cost per m² (labour)
£30 – £70
Tiling in the UK typically costs £30–£70 per square metre for labour, with tiles, adhesive and grout on top. A full bathroom commonly lands between £600 and £1,500 in labour depending on size and complexity. Preparation is what varies most — removing old tiles and getting the surface flat and sound can cost as much as the tiling itself.
| Job | Typical cost |
|---|---|
| Wall tiling, per m² (labour) | £30 – £70 |
| Floor tiling, per m² (labour) | £40 – £80 |
| Full bathroom (labour) | £600 – £1,500 |
| Kitchen splashback | £150 – £400 |
| Removing old tiles, per m² | £10 – £25 |
| Levelling or backing board, per m² | £15 – £40 |
| Day rate | £180 – £300 |
Typical UK guide prices — see the note at the foot of this page.
What affects the price?
Tile size and format. Large-format tiles cover ground quickly but are heavy, need a very flat surface and are unforgiving of any deviation. Small mosaics are slow. Standard ceramics in the middle are the cheapest to lay.
Pattern. Straight stack or brick bond is quick. Herringbone, chevron and diagonal layouts generate far more cuts and waste, and are commonly quoted at a premium.
Cuts and obstacles. A plain wall is fast. A wall with a window reveal, pipe penetrations, sockets and a shower niche is mostly cutting, and cutting is the slow part.
Material. Porcelain is harder than ceramic and slower to cut. Natural stone needs sealing, sometimes before as well as after laying.
And the surface underneath, which is the big one — covered below.
Preparation decides the finish
Tiles only ever look as flat as what they are stuck to. A tiler working over an uneven wall or a flexing floor cannot produce a good result, which is why good tilers spend real time on preparation and price for it.
Floors need to be rigid. A timber floor that moves will crack grout and eventually tiles; the usual answer is backer board or a decoupling membrane rather than tiling straight onto boards.
Walls need to be flat and sound. Old adhesive left from previous tiles has to come off, and plasterboard in a shower area should be a suitable tile backer board rather than ordinary board.
Wet areas need tanking — a waterproof membrane behind the tiles in showers. Grout is not waterproof, and neither is standard plasterboard. Skipping tanking is a common cause of damp appearing in the room beyond a shower wall a year or two later.
When comparing quotes, ask specifically what preparation each includes. That is usually where the price difference lives.
Buying tiles: order more than you need
Order at least ten percent more than the measured area, and fifteen percent for diagonal or herringbone layouts. Cuts, breakages and mis-cuts are normal, not a sign of carelessness.
Buy it all in one batch. Tiles are manufactured in batches with slight colour and size variation between them, and a top-up order weeks later may not match. The batch number is printed on the box — check they all agree.
Keep the spares. A cracked tile in three years is trivial to replace if you have a matching one and effectively impossible if you do not.
Ask the tiler to confirm quantities before you order. It is a two-minute calculation for them and it prevents both a shortfall mid-job and boxes of expensive surplus.
How to keep the cost down
Choose a simple layout. Straight bond in a standard size is dramatically cheaper to lay than herringbone in large format.
Remove old tiles yourself if you are able — it is unskilled, messy work at £10–£25 per m² if someone else does it.
Tile only what needs tiling. Full-height tiling on all four walls of a bathroom costs far more than tiling the wet areas and painting the rest, and often looks better.
Buy the tiles yourself after the tiler has confirmed quantities, so you control the spend on materials.
And get quotes broken into preparation, labour and materials. It is the only way to see whether one price is cheaper or simply omitting the tanking.
Frequently asked questions
How much does tiling cost per square metre?+
£30–£70 per m² for wall tiling labour and £40–£80 for floors, with tiles, adhesive and grout on top.
How much to tile a bathroom?+
£600–£1,500 in labour for a typical bathroom, depending on size, tile format and how many cuts are involved. Preparation and materials are additional.
How many spare tiles should I order?+
At least ten percent over the measured area, fifteen for diagonal or herringbone. Buy it all in one batch — colour varies between batches and a later top-up may not match.
Does a shower need tanking?+
Yes. Grout is not waterproof and neither is standard plasterboard, so a waterproof membrane behind the tiles is what keeps water out of the structure. Skipping it commonly shows up as damp a year or two later.
Can you tile over existing tiles?+
Sometimes, if the existing tiles are sound, flat and well bonded. It saves removal cost but adds thickness, which affects door clearances and window reveals. A tiler should assess rather than assume.
Why is herringbone more expensive?+
It generates far more cuts and more waste, and every cut takes time. Expect a premium over a straight bond layout in the same tile.
How long does tiling a bathroom take?+
Typically two to four days including preparation, with grouting usually the following day. Removing old tiles and levelling can add a day on its own.